Project Overview:The total height of the project is 108m, and the building surface is conical. The elevator has a long continuous working time. After starting up, the elevator needs to run continuously for more than 3000 hours, with a load of 1.8 to 2.0 tons per operation. When the cage is running, there is no one controlling it inside..
Number of elevators used:2 units, specification: SC200/200
Main engineering challenges solved:
1. The surface of the building is circular, and the influence of wind is significant;
2. Running at full capacity, with prolonged continuous operation time;
3. When the cage is in operation, there is no one controlling it inside;
4. The air environment around the fertilizer plant is harsh, and it is highly corrosive to the equipment.