High tower granulation project of fertilizer plant
Date: 2021-03-23 visit:96 Size: A+ A A-

Project Overview:The total height of the project is 108m, and the building surface is conical. The elevator has a long continuous working time. After starting up, the elevator needs to run continuously for more than 3000 hours, with a load of 1.8 to 2.0 tons per operation. When the cage is running, there is no one controlling it inside..

Number of elevators used:2 units, specification: SC200/200

Main engineering challenges solved:

1. The surface of the building is circular, and the influence of wind is significant;

2. Running at full capacity, with prolonged continuous operation time;

3. When the cage is in operation, there is no one controlling it inside;

4. The air environment around the fertilizer plant is harsh, and it is highly corrosive to the equipment.