The WBZ700-D secondary concrete mixing plant sent by Fangyuan Group to Shucheng, Anhui has been successfully commissioned and will participate in the construction of the Hezong section of the Deshang Expressway.
The Deshang (Dezhou to Shangrao) Expressway is a parallel line of the Beijing Taiwan (Beijing to Taipei) Expressway and an important part of the national highway network. The Dezhang Expressway Hezong section, also known as the Hefei to Zongyang section, starts from Gaodian Township in Feixi County and ends at Zongyang County, connecting to the Chizhou Changjiang Highway Bridge connection project. It has a total length of 134 kilometers, including 29 kilometers in Tongzhou, involving 3 towns and 14 villages including Daguan, Luting, and Kongcheng. The construction of the Hezong section is of great significance for accelerating the overall development and opening up of the Wanjiang region, and driving the economic and social development of Hefei, Lu'an, Anqing, and Tongling cities.