Customer Service
Home  >  Customer Service  >  Project Case
Fangyuan Marine Ship borne Mixing Plant Helps Malaysia's Ruba Cross Sea Bridge Construction Project
Date: 2023-03-02 visit:118 Size: A+ A A-

Recently, the offshore shipborne mixing plant manufactured by Fangyuan Group was officially put into operation on the Ruba Cross Sea Bridge in Malaysia. Its exquisite manufacturing technology and reliable product quality have been highly praised by users.

The Ruba Cross Sea Bridge project is located in Samarahan, Sarawak, Malaysia. It is one of the key projects of the entire coastal road project and the largest single bridge project under construction in Malaysia. The total length of the bridge is 4844 meters, the main channel bridge is 598.8 meters long, and the main span is 324.4 meters.项目建成后,将成为东马第一长桥。

Over the years, various products of Fangyuan Group have gained high trust and full recognition from foreign users.


0535-3297558