Solution for SC200/200 Construction Lift (Conventional Type)
Introduction: Conventional construction elevators have a wider range of applications and can be used for a long time on buildings such as ordinary projects, warehouses, docks, shipyards, well ports, bridges, power plants, chemical and fertilizer plants. They are vertical transportation equipment that can be used for both people and goods. According to the control system, it can be divided into: power frequency control system and variable frequency control system. Variable frequency control system is specifically divided into three types: low speed, medium speed, and high speed, with a maximum speed of 0-90m/min; Divided into two types based on the number of hanging cages: double cage and single cage; According to the size of the cage, it can be divided into two types: 3.2m × 1.5m × 2.2m and 3.0m × 1.3m × 2.2m; There are: upper and lower limit devices, upper and lower limit devices, upper and lower deceleration limit devices, load limiter devices, cage anti impact bottom devices, cage anti impact top measures, driving devices and cage anti detachment dual safety hook devices, door electromechanical interlocking devices, standard section guide rail anti bolt reverse device, cage anti fall and other safety devices. Additional functions such as facial fingerprint recognition system, automatic leveling device, automatic lubrication device, floor call device, etc. can also be selected according to different user needs.
Solution: Conventional construction elevators are used in ordinary construction environments. According to the specific needs of the project, a position of 2.8m to 3.2m away from the building is selected and determined (specific solutions for special cases). After 3 to 5 standard sections, cages, and drive devices are lifted into place with the assistance of equipment such as a 3-ton truck crane or tower crane, other work such as debugging, raising standard sections, and installing attachment devices can be completed by the construction elevator itself; By completing the debugging of the construction elevator, personnel, various materials, equipment, and other materials can be transported up and down, improving work efficiency; The height of the construction elevator can be determined according to the progress of the project, and the maximum height can exceed 300m.
Solution for SC200/200 inclined construction elevator
Introduction: The inclined construction elevator is mainly suitable for the construction of bridges, high-speed railways, and highways, as well as the construction of high-rise buildings with special shapes. It is a vertical transportation equipment that can be used for both people and goods. The biggest feature of this elevator is that the guide rail frame can be raised parallel to different inclination angles of the building, but the bottom of the cage remains horizontal at all times, ensuring that personnel and transported objects reach the designated position smoothly and safely. The maximum inclination angle range of this construction elevator is 0-15 °; The elevator adopts frequency conversion control technology, with smooth starting and braking and no impact; The starting current of the equipment is less than the rated current, which can effectively maintain the safe operation of the power grid; Advanced structural design, requiring only small components to adapt to different angles of construction, economical and reliable, and fast transition; It can also be used as a regular construction elevator.
Solution: The inclined construction elevator is positioned at a distance of 2.8m to 3.2m from the building according to the specific needs of the project. It is assisted by equipment such as a 3-ton truck crane or tower crane to lift 3 to 5 standard sections, cages, and drive devices into place. Other work, such as debugging, raising standard sections, and installing attachment devices, can be completed by the construction elevator itself; By completing the debugging of the construction elevator, personnel, various materials, equipment, and other materials can be transported up and down, improving work efficiency; The height of the construction elevator can be determined according to the progress of the project, and the maximum height can exceed 300m.