Case:
1. Project Name: Qingdao International Shipping Center Project
Project Overview: The Qingdao International Shipping Center project is located at 66 Lianyungang Road, Shibei District, Qingdao City. There are 56 floors above ground and 5 floors underground; The total construction area is 160057.13 square meters, with a total above ground construction area of 107688.88 square meters and a total underground construction area of 52368.25 square meters; The total height is 248.5 meters. The structural type is a frame core tube structure. Based on the construction drawings and the actual situation of the project, it is proposed to install an SC100 construction elevator in the shaft to meet the vertical transportation of personnel and some materials during the secondary structure construction phase.
Number of elevators used: 1, specification: SC100 shaft type construction elevator
Main engineering challenges solved:
1. The space in the shaft is narrow, and the size of the entrance and exit is 1.1 * 2.1m (width * height);
2. The height of the shaft is high, making it difficult to install the attachment frame;
3. The project has multiple floors, and each stop floor must be effectively protected. When the floor door is opened, the elevator must stop working;
4. The lighting inside the well is dark, and the equipment must achieve automatic leveling function;
The installation and disassembly of the equipment must be completed by oneself.
E-8 image
2. Project Name: Shandong Philadelphia Television Broadcasting Tower Project
Project Overview: The total height of the Feicheng TV Broadcasting Tower project in Shandong is 116 meters. The structural type is a closed frame core tube structure. Based on the construction drawings and the actual situation of the project, it is proposed to install an SC100 construction elevator in the reserved elevator shaft to meet the vertical transportation of personnel and some materials during the secondary structure construction phase.
Number of elevators used: 1, specification: SC100 shaft type construction elevator
Main engineering challenges solved:
1. The space in the shaft is narrow, and the size of the entrance and exit is 1.1 * 2.1m (width * height);
2. The well is in a fully enclosed state with no communication signal;
3. The lifting cage is equipped with two doors, and each stopping floor must be effectively protected. When the floor door is opened, the elevator must stop working;
4. The lighting inside the well is dark, and the equipment must achieve automatic leveling function;
5. The installation and disassembly of the equipment must be completed by oneself